問題1
Task 4: Configure and create Technical Objects
The project team evaluates during the implementation project Technical Object structures in SAP S/4HANA Asset Management. The following features need to be checked:
* Configure and create Functional Locations
* Create, serialize and install Equipment
* Create Functional Location master record ZZ0##-01 and save it. Use the following information:

* Create Equipment master record EQUI-## and save it. Use the following information:

* Serialize the just created Equipment master record EQUI-## . Use the following data:

* Install Equipment EQUI-## at the Functional Location 00-01-ASS-02 .
正確答案:
See the Explanation for complete Solution of this Task.
Explanation:
Task 4: Configure and create Technical Objects
This task evaluates your ability to structure and manage the physical and functional hierarchy of assets in SAP S/4HANA Asset Management.
Step 1: Create Functional Location Master Record
A Functional Location represents the area at which a maintenance task is to be performed.
* Access the Transaction : Use transaction code IL01 (Create Functional Location).
* Enter Initial Data :
* Functional Location : ZZ048-01.
* Structure Indicator : ZZ48.
* Functional Location Category : T.
* Press Enter .

* Enter General Data :
* Description : Production Line Z48.
* Enter Location and Organization Data :
* Maintenance Plant : 1020.
* Cost Center : 4110.
* Planning Plant : 1020.
* Planner Group : Z48.
* Main WorkCtr : T-ME48.
* Work Center Plant : 1010.
* Save : Click the Save icon.
Explanation : By creating this record, you define a specific functional area within Plant 1020 where maintenance costs and history will be tracked for all equipment installed there.


Step 2: Create Equipment Master Record
Equipment represents an individual physical object that is maintained as an autonomous unit.
* Access the Transaction : Use transaction code IE01 (Create Equipment).
* Enter Initial Data :
* Equipment : EQUI-48.
* Equipment Category : T.
* Press Enter .

* Enter General Data :
* Description : Drive Motor GR48.
* Save : Click the Save icon.
Explanation : This step creates a master record for a physical asset-a drive motor-allowing you to track its individual lifecycle, independent of where it is currently installed.


Step 3: Serialize the Equipment
Serialization links a piece of equipment to a specific material and unique serial number for inventory management and tracking.
* Access the Transaction : Use transaction code IE02 (Change Equipment) and enter EQUI-48.
* Navigate to Serial Data : Go to the SerData (Serial Data) tab.
* Enter Serialization Data :
* Material : T-PM8000.
* Serial Number : EQUI-48.
* Save : Click the Save icon.
Explanation : Linking the motor to Material T-PM8000 enables the system to track this specific asset as a serialized part, which is essential for warehouse movements and warranty tracking.

Step 4: Install Equipment at a Functional Location
This establishes the relationship between the physical asset (Equipment) and the functional area where it is operating.
* Access the Transaction : Use transaction code IE02 (Change Equipment) for EQUI-48.
* Modify Installation Location :
* Click on the Structure tab.
* Find the FunctLoc field.
* Enter the location: 00-01-ASS-02.
* Save : Click the Save icon.
Explanation : This installation "plugs" your drive motor into the functional hierarchy at location 00-01-ASS-02. From this point forward, any maintenance performed on this motor will be automatically associated with that location's history.
問題2
Use Phase-Based Maintenance Processing
The project team evaluates during the implementation project Phase-Based Maintenance Processing in SAP S
/4HANA Asset Management. The following features need to be checked:
* Initiate and screen a Maintenance Notification
* Plan Maintenance Order and send it for approval
* Create a Maintenance Notification using an already available notification type which is suitable for phase-based maintenance and save it.
Use the following data:

* Screen and accept the just created Maintenance Notification.
* Create an Order (Phase-based) for your accepted notification and submit it for approval.
Use the following data:
正確答案:
See the Explanation for complete Solution of this Task.
Explanation:
Task 10 Overview
This task evaluates your ability to manage the newer, phase-led maintenance workflow in SAP S/4HANA.
Unlike the traditional "emergency" repair you did earlier, this process includes formal screening and approval steps Step 1: Create a Phase-Based Maintenance Notification In this step, you initiate the request.
* Access the Transaction : Use transaction IW21 or the Fiori app Create Maintenance Request .
* Select Notification Type : Use a type configured for phase-based maintenance (typically Y1 - Maintenance Request ).
* Enter the Following Data :
* Technical Object : T-PB48
* Description : Defective pump (phase-based)
* Current Location : Production Line 1
* Detection Method : Continuous Condition Monitoring
* Operational Effect : Production restricted
* Save : Note the notification number generated.
Explanation : This step "initiates" the maintenance process. In phase-based maintenance, the notification starts in the Initiation phase, where it must be reviewed before any work is planned.
Step 2: Screen and Accept the Notification
As a "Maintenance Coordinator," you must now review the request.
* Access the Fiori App : Open Screen Maintenance Requests .
* Locate Your Notification : Find the notification you just created for T-PB48.
* Perform Screening :
* Review the details to ensure they are complete.
* Click Accept to move it to the next phase.
Explanation : "Screening" is a quality gate. It ensures that the maintenance team only spends time planning valid, well-described issues. Once accepted, the notification moves from the Initiation phase to the Screening phase and finally becomes available for planning.
Step 3: Create and Plan the Phase-Based Order
Now you will create the formal work order for the accepted request.
* Create Order : From within the accepted notification, or using the Manage Maintenance Backlog app, choose to Create Order .
* Enter Planning Data :
* Technical Object : T-PB48
* Operation 0010 Description : Repair damage
* Operation 0010 Work : 2 h
* Submit for Approval : Look for the Submit for Approval button at the top of the order screen.
Explanation : This step moves the order into the Planning phase. By submitting it for approval, you are requesting the budget and resources to perform the work. The order status will change to indicate it is
"Waiting for Approval"

專業認證

NewDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用NewDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

Try Before Buy

NewDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。