問題1
Which items should be included in a report that is produced after execution of a test suite?
Which items should be included in a report that is produced after execution of a test suite?
正確答案: D
說明:(僅 NewDumps 成員可見)
問題2
You work for a company that produces a credit-checking software package. This product comes in three variants, each of which is tailored to meet the rules and attitudes of lending and borrowing money for a particular group of countries. Each variant has two different versions at any one time: the current live release and the next release, which is under development. Each variant has its own test environment; these environments are built on different platforms to reflect the diversity of real customer platforms.
A single TAS meets the automation needs of all three variants, with configurable features that allow for the platform differences. The SUT's test requirements are expanding rapidly and the TAS often needs enhancement to support this. The SUT's platforms are also changeable, due to updates from their vendors or a desire to sample different ones.
After any change, the TAS is re-installed from a central repository with automated scripts that implement the configuration parameters for the target environment. Following this, it has often been impossible to run tests properly or even at all and the installation has had to be repeated after the cause has been found. Which of the following actions is MOST likely to solve this issue?
You work for a company that produces a credit-checking software package. This product comes in three variants, each of which is tailored to meet the rules and attitudes of lending and borrowing money for a particular group of countries. Each variant has two different versions at any one time: the current live release and the next release, which is under development. Each variant has its own test environment; these environments are built on different platforms to reflect the diversity of real customer platforms.
A single TAS meets the automation needs of all three variants, with configurable features that allow for the platform differences. The SUT's test requirements are expanding rapidly and the TAS often needs enhancement to support this. The SUT's platforms are also changeable, due to updates from their vendors or a desire to sample different ones.
After any change, the TAS is re-installed from a central repository with automated scripts that implement the configuration parameters for the target environment. Following this, it has often been impossible to run tests properly or even at all and the installation has had to be repeated after the cause has been found. Which of the following actions is MOST likely to solve this issue?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題3
You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:
1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
2) Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it, or return it for clarification/modification.
3) Forward approved requests to the Purchasing Department.
4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.
Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.
The functional suitability testing of Requirement 1 has now been automated as fully as possible. A change to add audit logging of user activity is planned but has not yet been made. After a small change to the UI code, the last regression run contained a significant number of unexplained test failures. At the point each test stopped, the actual and expected results showed no discrepancies. In each case, the run was able to continue with the next test in the suite. Preliminary investigation showed that the points at which these tests stopped had nothing obvious in common.
Which option below contains the BEST next steps to investigate this?
You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:
1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
2) Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it, or return it for clarification/modification.
3) Forward approved requests to the Purchasing Department.
4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.
Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.
The functional suitability testing of Requirement 1 has now been automated as fully as possible. A change to add audit logging of user activity is planned but has not yet been made. After a small change to the UI code, the last regression run contained a significant number of unexplained test failures. At the point each test stopped, the actual and expected results showed no discrepancies. In each case, the run was able to continue with the next test in the suite. Preliminary investigation showed that the points at which these tests stopped had nothing obvious in common.
Which option below contains the BEST next steps to investigate this?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題4
You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:
1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
2) Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it, or return it for clarification/modification.
3) Forward approved requests to the Purchasing Department.
4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.
Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.
You intended to use the implementation of Requirement 1 as a pilot for the TAS. Which TWO of these objectives are MOST appropriate for this pilot?
a) Generate prototypes for the implementation options of the TAS
b) Demonstrate the suitability of at least one TAS implementation option c) Expose any risks to further deployment of this TAS d) Assess the quality of the implementation of Requirement 1 e) Enable a calculation of the likely return on investment for this TAS
You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:
1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
2) Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it, or return it for clarification/modification.
3) Forward approved requests to the Purchasing Department.
4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.
Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.
You intended to use the implementation of Requirement 1 as a pilot for the TAS. Which TWO of these objectives are MOST appropriate for this pilot?
a) Generate prototypes for the implementation options of the TAS
b) Demonstrate the suitability of at least one TAS implementation option c) Expose any risks to further deployment of this TAS d) Assess the quality of the implementation of Requirement 1 e) Enable a calculation of the likely return on investment for this TAS
正確答案: B
說明:(僅 NewDumps 成員可見)
問題5
You are a TAE responsible for a TAS that is used on several products, all of which have complex UIs. It has been decided that all radio buttons in one of the products will be changed to checkboxes; checkboxes have not been used in the UI before.
You are updating the TAS to align with this change. Which TWO actions would be MOST appropriate?
a) Write a function to handle checkboxes and add it to the function library b) Amend the function that handles radio buttons to also handle checkboxes c) Update the Test Automation Architecture d) Identify all test scripts that will be affected by the change e) Amend the library naming conventions to accommodate the change
You are a TAE responsible for a TAS that is used on several products, all of which have complex UIs. It has been decided that all radio buttons in one of the products will be changed to checkboxes; checkboxes have not been used in the UI before.
You are updating the TAS to align with this change. Which TWO actions would be MOST appropriate?
a) Write a function to handle checkboxes and add it to the function library b) Amend the function that handles radio buttons to also handle checkboxes c) Update the Test Automation Architecture d) Identify all test scripts that will be affected by the change e) Amend the library naming conventions to accommodate the change
正確答案: B
說明:(僅 NewDumps 成員可見)
問題6
You are working for a clothing retailer that has big stores in many cities. Your TAS, for the first time, has just been used for reliability and stress testing of the overnight batch processing that collects sales transactions from the stores and adds them to a data warehouse; functional suitability tests have been reused for these runs.
All tests have finished normally but their results have not been satisfactory, and it has been difficult to understand the nature of the defect or defects that have been causing the failures.
What data, if added to the test logs, would MOST likely help with debugging in this situation?
a) Dynamic data about the status of the test platforms
b) Screenshots taken during test execution
c) Crash dumps and stack traces
d) Values of randomly generated test input data
e) Counts of the quantity of test cases executed during each run
You are working for a clothing retailer that has big stores in many cities. Your TAS, for the first time, has just been used for reliability and stress testing of the overnight batch processing that collects sales transactions from the stores and adds them to a data warehouse; functional suitability tests have been reused for these runs.
All tests have finished normally but their results have not been satisfactory, and it has been difficult to understand the nature of the defect or defects that have been causing the failures.
What data, if added to the test logs, would MOST likely help with debugging in this situation?
a) Dynamic data about the status of the test platforms
b) Screenshots taken during test execution
c) Crash dumps and stack traces
d) Values of randomly generated test input data
e) Counts of the quantity of test cases executed during each run
正確答案: D
說明:(僅 NewDumps 成員可見)
問題7
Your company is about to start a project to replace an old sales and merchandising system with a new version that will be based on modern platforms. The main requirements for the system are:
1. Loading sales data, sent electronically from the stores each evening, into a central database.
2. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores.
3. Producing forecast reports, used to predict future demand for each product, based on a combination of sales history and forecasting parameters. The parameters will be entered by the merchandisers into a browser-based front end and the reports will be produced overnight. The users will be able to retrieve the reports, on screen or in print, via an interactive feature.
Requirements 1 and 2 were already met by the old system and will be rewritten in the new system with some minor functional changes. The sales data will, as before, be loaded in an overnight batch run. There have been problems with the old system at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the next working day. The Data Centre manager requires that the new system's overnight batch runs take 10% less time than the old one, including the new reports, to allow time for all jobs to complete.
Requirement 3 is new. The functionality provided by the UI will be simple and the Sales & Merchandising manager requires that it be easy to use.
The data for testing the reports will be extracted from the old system in production and will be anonymized before use.
The system will be developed using an Agile lifecycle with iterations of fixed length. This will be the first full deployment of this methodology, which has just completed a successful pilot. It is a relatively simple development and is expected to be completed in three releases, each taking approximately two months.
Until now the company has not automated test execution, but the Agile pilot identified this as a critical success factor. You are an experienced TAE and have been recruited to implement test automation, and you are now considering what the TAS for this should look like.
Which option contains the THREE MOST important considerations in determining the nature of the TAS that will be needed for this project?
i) The tool(s) chosen for functional test automation should support scripting techniques that will be compatible with a performance test tool.
ii) The tool(s) chosen for functional test automation should support scripting techniques that will be useful for usability testing.
iii) The TAS should support testing at the component integration, system, system integration and acceptance levels.
iv) The TAS should support testing at the component, component integration, system and acceptance levels.
v) The TAS should support the handling of the large quantities of data that will be needed to test the forecast reports.
Your company is about to start a project to replace an old sales and merchandising system with a new version that will be based on modern platforms. The main requirements for the system are:
1. Loading sales data, sent electronically from the stores each evening, into a central database.
2. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores.
3. Producing forecast reports, used to predict future demand for each product, based on a combination of sales history and forecasting parameters. The parameters will be entered by the merchandisers into a browser-based front end and the reports will be produced overnight. The users will be able to retrieve the reports, on screen or in print, via an interactive feature.
Requirements 1 and 2 were already met by the old system and will be rewritten in the new system with some minor functional changes. The sales data will, as before, be loaded in an overnight batch run. There have been problems with the old system at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the next working day. The Data Centre manager requires that the new system's overnight batch runs take 10% less time than the old one, including the new reports, to allow time for all jobs to complete.
Requirement 3 is new. The functionality provided by the UI will be simple and the Sales & Merchandising manager requires that it be easy to use.
The data for testing the reports will be extracted from the old system in production and will be anonymized before use.
The system will be developed using an Agile lifecycle with iterations of fixed length. This will be the first full deployment of this methodology, which has just completed a successful pilot. It is a relatively simple development and is expected to be completed in three releases, each taking approximately two months.
Until now the company has not automated test execution, but the Agile pilot identified this as a critical success factor. You are an experienced TAE and have been recruited to implement test automation, and you are now considering what the TAS for this should look like.
Which option contains the THREE MOST important considerations in determining the nature of the TAS that will be needed for this project?
i) The tool(s) chosen for functional test automation should support scripting techniques that will be compatible with a performance test tool.
ii) The tool(s) chosen for functional test automation should support scripting techniques that will be useful for usability testing.
iii) The TAS should support testing at the component integration, system, system integration and acceptance levels.
iv) The TAS should support testing at the component, component integration, system and acceptance levels.
v) The TAS should support the handling of the large quantities of data that will be needed to test the forecast reports.
正確答案: B
說明:(僅 NewDumps 成員可見)
問題8
Which of the following practices can be used to specify the active (i.e., actually available) features for each release of the SUT and determine the corresponding automated tests that must be executed for a given release?
Which of the following practices can be used to specify the active (i.e., actually available) features for each release of the SUT and determine the corresponding automated tests that must be executed for a given release?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題9
When looking for the cause of an intermittent failure, which action is MOST likely to help?
When looking for the cause of an intermittent failure, which action is MOST likely to help?
正確答案: B
說明:(僅 NewDumps 成員可見)