先試後買

購買之前,你可以先嘗試下載一個試用版本。目前我們只提供PDF版本的試用DEMO,軟件版本只提供截圖。

  • 全天候客戶支持,安全的購物網站。
  • 一年免費更新,以符合真正的考試場景。
  • 支付成功以后,你能在網站上立即下載所購買的產品。
問題1
When moving from a POWER5 server with IBM i V5R4 to a Power 720, which of the following can be transferred?

正確答案: B
問題2
An IBM i customer would like to use external storage but has no desire to implement VIO Server. Which of these IBM Systems Storage products is a valid choice to support this customer's requirements?

正確答案: D
問題3
Which of the following was added in IBM i 7.1 to reduce disk protection recovery time?

正確答案: A
問題4
A customer needs external storage attached to their Power Systems server. They are limited in regard to the amount of floor space and energy/cooling that can be provided for the external storage device.
Which IBM Systems Storage product will work best with this customer's limitation?

正確答案: D
問題5
A customer is considering a Power 720 and would like to have Solid State Drives (SSD) in their configuration. What needs to be considered when configuring this system?

正確答案: A
問題6
Which of the following is a value proposition for Power Systems and IBM i as published in a recent International Technology Group study?

正確答案: B
問題7
A customer is considering a Power 770 with two IBM i 7.1 partitions. The server will be natively attached to the same DS8000 System Storage already in use by other IBM i sewers in their enterprise.
A System Storage sizing indicates that each LPAP will require 128 LUNs. Multipath connectivity is required for redundancy. The customer does not want to invest in additional skills or to use NPIV,
Which of the following is necessary to support the customer requirements?

正確答案: A
問題8
Which process can be automated using the "schedule operations" function of the HMC?

正確答案: A

專業認證

NewDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用NewDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

Try Before Buy

NewDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。