問題1
A customer has configured IBM FileNet P8 Content Engine on an IBM WebSphere Application Server profile (AppSrv01). AppSrv01 fails and cannot be recovered. Which of the following set of tasks would help the customer deploy Content Engine on a new WebSphere Application Server profile (AppSrv02) using the existing Content Engine Bootstrap ear file?
A customer has configured IBM FileNet P8 Content Engine on an IBM WebSphere Application Server profile (AppSrv01). AppSrv01 fails and cannot be recovered. Which of the following set of tasks would help the customer deploy Content Engine on a new WebSphere Application Server profile (AppSrv02) using the existing Content Engine Bootstrap ear file?
正確答案: D
問題2
When installing and deploying Workplace XT across four nodes, at a single site in a highly available configuration (i.e. J2EE application cluster), which of the following two statements follows IBM's best practices?
When installing and deploying Workplace XT across four nodes, at a single site in a highly available configuration (i.e. J2EE application cluster), which of the following two statements follows IBM's best practices?
正確答案: A,E
問題3
An administrator is preparing to update all IBM FileNet P8 components with a new Content Engine client fix pack. The installation and upgrade worksheet will be used to gather values for the client update. What must be done to filter the worksheet for Content Engine client installer values only?
An administrator is preparing to update all IBM FileNet P8 components with a new Content Engine client fix pack. The installation and upgrade worksheet will be used to gather values for the client update. What must be done to filter the worksheet for Content Engine client installer values only?
正確答案: D
問題4
A highly available IBM FileNet P8 environment has just been installed with horizontally scaled Process Engine (PE) servers using a hardware load balancer. There are currently two PE servers in this farm. There are three Connection Points currently configured, one for PE #1, one for PE #2, and one for the virtual address and port of the farm as defined in the load balancer. Additionally there are load balanced implementations of Workplace XT (WPXT) and Content Engine (CE). Assuming all P8 core components are currently active, and the Connection Point for the PE farm is currently selected in the WPXT Site Preferences, which of the following is the best choice for validating PE functionality in conjunction with the load balancer.
A highly available IBM FileNet P8 environment has just been installed with horizontally scaled Process Engine (PE) servers using a hardware load balancer. There are currently two PE servers in this farm. There are three Connection Points currently configured, one for PE #1, one for PE #2, and one for the virtual address and port of the farm as defined in the load balancer. Additionally there are load balanced implementations of Workplace XT (WPXT) and Content Engine (CE). Assuming all P8 core components are currently active, and the Connection Point for the PE farm is currently selected in the WPXT Site Preferences, which of the following is the best choice for validating PE functionality in conjunction with the load balancer.
正確答案: B
問題5
A highly available IBM FileNet P8 environment has just been installed with horizontally scaled Process Engine (PE) servers using a hardware load balancer. There are currently two PE servers in this farm. There are three Connection Points currently configured, one for PE #1, one for PE #2, and one for the virtual address and port of the farm as defined in the load balancer. Additionally there are load balanced implementations of Workplace XT (WPXT) and Content Engine (CE). Assuming all P8 core components are currently active and appear to be functioning properly, and the Connection Point for the PE farm is currently selected in the WPXT Site Preferences, which of the following is the best choice for validating that all PE servers are responding properly through the load balancer.
A highly available IBM FileNet P8 environment has just been installed with horizontally scaled Process Engine (PE) servers using a hardware load balancer. There are currently two PE servers in this farm. There are three Connection Points currently configured, one for PE #1, one for PE #2, and one for the virtual address and port of the farm as defined in the load balancer. Additionally there are load balanced implementations of Workplace XT (WPXT) and Content Engine (CE). Assuming all P8 core components are currently active and appear to be functioning properly, and the Connection Point for the PE farm is currently selected in the WPXT Site Preferences, which of the following is the best choice for validating that all PE servers are responding properly through the load balancer.
正確答案: D
問題6
An administrator is preparing to install the IBM FileNet Content Engine client files on the Application Engine. What should be verified prior to starting the installation of the client files?
An administrator is preparing to install the IBM FileNet Content Engine client files on the Application Engine. What should be verified prior to starting the installation of the client files?
正確答案: B
問題7
Users report to the P8 Administrator that they cannot logon to Workplace XT. The Application Server for Content Engine is up and running properly. The Administrator looks at the Application Server log and finds the following error: ============= Root Exception message:CORBA NO_RESPONSE 0x4942fb01 Maybe; nested exception is: org.omg.CORBA.NO_RESPONSE: Request 15 timed out vmcid: IBM minor code: B01 completed: Maybe Connection not available while invoking method createOrWaitForConnection for resource [DATASOURCE_NAME] ============= What could be the cause of this error?
Users report to the P8 Administrator that they cannot logon to Workplace XT. The Application Server for Content Engine is up and running properly. The Administrator looks at the Application Server log and finds the following error: ============= Root Exception message:CORBA NO_RESPONSE 0x4942fb01 Maybe; nested exception is: org.omg.CORBA.NO_RESPONSE: Request 15 timed out vmcid: IBM minor code: B01 completed: Maybe Connection not available while invoking method createOrWaitForConnection for resource [DATASOURCE_NAME] ============= What could be the cause of this error?
正確答案: C
問題8
A highly available IBM FileNet P8 environment has just been installed with an IBM WebSphere Application Server Network Deployment (WAS-ND) Content Engine (CE) cluster containing four CE JVM's. A hardware load balancer is being used to spread HTTP/HTTPS traffic across the CE JVM's. Workplace XT (WPXT) has been configured to point to this CE cluster. Assuming all four CE JVM's are currently active, which two of the following are the best choices for validating proper CE responses through the load balancer?
A highly available IBM FileNet P8 environment has just been installed with an IBM WebSphere Application Server Network Deployment (WAS-ND) Content Engine (CE) cluster containing four CE JVM's. A hardware load balancer is being used to spread HTTP/HTTPS traffic across the CE JVM's. Workplace XT (WPXT) has been configured to point to this CE cluster. Assuming all four CE JVM's are currently active, which two of the following are the best choices for validating proper CE responses through the load balancer?
正確答案: A,B