先試後買

購買之前,你可以先嘗試下載一個試用版本。目前我們只提供PDF版本的試用DEMO,軟件版本只提供截圖。

  • 全天候客戶支持,安全的購物網站。
  • 一年免費更新,以符合真正的考試場景。
  • 支付成功以后,你能在網站上立即下載所購買的產品。
問題1
You are a database administrator for a Microsoft SQL Server 2012 database named AdventureWorks2012.
You create an Availability Group defined by the following schema. (Line numbers are included for reference only.)

You need to implement an AlwaysOnAvailablity Group that will meet the following conditions:
Production transactions should be minimally affected.
The secondary server should allow reporting queries to be performed.
If the primary server goes offline, the secondary server should not automatically
take over.
Which Transact-SQL statement should you insert at line 06?
---

正確答案: C
問題2
HOTSPOT
You are developing a SQL Server Integration Services (SSIS) package.
You use a Data Profiling task to examine the data from a source system.
You need to establish: - The minimum and maximum dates for the datetime columns in the source data - The minimum, maximum, and average values for numeric columns in the source data You need to use the appropriate profile type in the Data Profiling task.
Which profile type should you use? (To answer, select the appropriate profile type in the answer area.)
正確答案:
問題3
Note: This question is part of a series of questions that use the same or similar answer choices. An answer choice may be correct for more than one question in the series. Each question is independent of the other questions in this series. Information and details provided in a question apply only to that question.
To ease the debugging of packages, you standardize the SQL Server Integration Services (SSIS) package logging methodology.
The methodology has the following requirements:
Centralized logging in SQL Server
Simple deployment
Availability of log information through reports orT-SQL
Automatic purge of older log entries
Configurable log details
-----
You need to configure a logging methodology that meets the requirements while minimizing
the amount of deployment and development effort.
What should you do?

正確答案: C
問題4
You are designing a data warehouse with two fact tables. The first table contains sales per
month and the second table contains orders per day.
Referential integrity must be enforced declaratively.
You need to design a solution that can join a single time dimension to both fact tables.
What should you do?

正確答案: D
問題5
A SQL Server Integration Services (SSIS) package imports daily transactions from several files into a SQL Server table named Transaction. Each file corresponds to a different store and is imported in parallel with the other files. The data flow tasks use OLE DB destinations in fast load data access mode.
The number of daily transactions per store can be very large and is growing. The Transaction table does not have any indexes.
You need to minimize the package execution time.
What should you do?

正確答案: B
說明:(僅 NewDumps 成員可見)
問題6
DRAG DROP
You are a database administrator of a Microsoft SQL Server 2012 environment. The environment contains two servers named SQLServer01 and SQLServer02. The database Contoso exists on SQLServer01.
You plan to mirror the Contoso database between SQLServer01 and SQLServer02 by using database mirroring.
You need to prepare the Contoso database for database mirroring.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
正確答案:
問題7
You administer two Microsoft SQL Server 2012 servers. Each server resides in a different,
untrusted domain.
You plan to configure database mirroring.
You need to be able to create database mirroring endpoints on both servers.
What should you do?

正確答案: A
問題8
DRAG DROP
You administer three Microsoft SQL Server 2012 servers named ServerA, Servers, and ServerC.
ServerA is the acting principal and ServerB is the mirror.
You need to add ServerC as a witness to the existing mirroring session between ServerA and ServerB. You need to achieve this goal without delaying synchronization.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
正確答案:
問題9
You are developing a SQL Server Integration Services (SSIS) project that contains a project Connection Manager and multiple packages.
All packages in the project must connect to the same database. The server name for the database must be set by using a parameter named ServerParam when any package in the project is executed.
You need to develop this project with the least amount of development effort.
What should you do? (Each correct answer presents part of the solution. Choose all that apply.)

正確答案: A,B,E

專業認證

NewDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用NewDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

Try Before Buy

NewDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。