問題1
Identify the user Interface for viewing data collected over to the planning server from the transaction Instances.
Identify the user Interface for viewing data collected over to the planning server from the transaction Instances.
正確答案: E
問題2
In Oracle ASCP, which three types of plan can be launched?
In Oracle ASCP, which three types of plan can be launched?
正確答案: C,D,E
說明:(僅 NewDumps 成員可見)
問題3
Identify three correct ways to view differences between an unconstrained demand plan and a constrained demand plan.
Identify three correct ways to view differences between an unconstrained demand plan and a constrained demand plan.
正確答案: B,C,D
問題4
Identify the statement that Is NOT correct.
Identify the statement that Is NOT correct.
正確答案: A
問題5
Identify the correct statement about setting lead time information In the Sublnventory Definition form.
Identify the correct statement about setting lead time information In the Sublnventory Definition form.
正確答案: C
問題6
The planner wants to compare a Baseline plan with a Simulation plan. He or she Is having difficulties displaying the results of the Plan Comparison report.
Select the possible reason for this difficulty.
The planner wants to compare a Baseline plan with a Simulation plan. He or she Is having difficulties displaying the results of the Plan Comparison report.
Select the possible reason for this difficulty.
正確答案: E
問題7
Exhibit.

In a manufacturing environment where Oracle Shop Floor Management Is used, the production process with Information about Yield (Yld), Net Planning Percent (NPP), Cumulative yield (CY), Reverse Cumulative Yield (RCY) is displayed for a product.
If the order quantity is 100, what is the raw material quantity and resource requirement ASCP will schedule respectively at operation sequence 10?
Exhibit.

In a manufacturing environment where Oracle Shop Floor Management Is used, the production process with Information about Yield (Yld), Net Planning Percent (NPP), Cumulative yield (CY), Reverse Cumulative Yield (RCY) is displayed for a product.
If the order quantity is 100, what is the raw material quantity and resource requirement ASCP will schedule respectively at operation sequence 10?
正確答案: D
問題8
Identify the Data Elements that Strategic Network Optimization publishes to an ASCP Plan through standard Integration.
Identify the Data Elements that Strategic Network Optimization publishes to an ASCP Plan through standard Integration.
正確答案: B
問題9
ABC Corporation uses a third-party configuration tool for booking their configured sales orders and creating a configured Bill of Material (BOM). This is a simple configuration process.
However, during the Implementation of Oracle E-Business Suite, the client installed Inventory, BOM, Work In Process (WIP), Engineering, Order Management, Receivables, and General Ledger modules. The SuperUser wants Oracle to be used for creating a configured BOM when a Sales Order Is created.
What would be your recommendation in this situation?
ABC Corporation uses a third-party configuration tool for booking their configured sales orders and creating a configured Bill of Material (BOM). This is a simple configuration process.
However, during the Implementation of Oracle E-Business Suite, the client installed Inventory, BOM, Work In Process (WIP), Engineering, Order Management, Receivables, and General Ledger modules. The SuperUser wants Oracle to be used for creating a configured BOM when a Sales Order Is created.
What would be your recommendation in this situation?
正確答案: B