IBM C2180-278題庫介紹
光靠死背很難應付 IBM Worklight V6.0 Mobile Application Development 的實戰題型,臨場手感需要反覆演練。NewDumps 的測試引擎完整模擬 C2180-278 正式考試環境,54 道模擬試題練熟之後,上場自然從容。
IBM C2180-278 考試概覽:
| 認證廠商: | IBM |
|---|---|
| 考試名稱: | IBM Worklight V6.0 行動應用程式開發 |
| 考試代碼: | 000-278 |
| 及格分數: | 70% |
| 實際考試題數: | 54-60 |
| 證照有效期限: | 3 年 |
| 支援語言: | English |
| 考試形式: | 情境題, 選擇題 |
| 相關認證: | IBM Certified Mobile System Administrator - Worklight V6.0 (C2180-279) |
| 考試費用: | USD 200 |
| 考試時間: | 90 分鐘 |
| 推薦課程: | IBM Worklight V6.0 訓練課程 |
| 考試報名: | Pearson VUE IBM 認證考試 |
| 範例考題: | IBM C2180-278 範例考題 |
| 考試方式: | 於 Pearson VUE 考試中心進行現場監考;本考試已停辦,由 C2180-278 取代 |
| 必備條件: | 具備 HTML5、CSS、JavaScript 基礎知識及行動開發概念;建議實際操作過 IBM Worklight V6.0 |
| 官方大綱網址: | https://www.ibm.com/certify |
IBM C2180-278 考試大綱主題:
| 章節 | 權重 | 目標 |
|---|---|---|
| 部署與管理 | 9% | - 使用直接更新功能 - 設定遠端通知 - 透過應用程式中心管理應用程式 - 建置應用程式並部署至 Worklight Server |
| 開發環境設定 | 7% | - 設定原生 SDK(Xcode、Android SDK、Visual Studio) - 設定第三方 JavaScript 程式庫 - 使用行動瀏覽器模擬器與測試工作台 - 安裝並設定 Worklight Studio V6.0 |
| 伺服器端整合與配接器 | 27% | - 實作伺服器端 JavaScript 程序 - 處理請求與回應資料轉換 - 設定配接器安全性與錯誤處理 - 建立並設定 HTTP、SQL、Cast Iron 及 SOAP 配接器 - 連線至後端系統與網路服務 |
| 用戶端開發 | 41% | - 建立並架構 Worklight 專案 - 使用 Worklight 用戶端 API(WL.Client、WL.Device、WL.Analytics) - 運用 HTML5、CSS3、JavaScript 建置回應式使用者介面 - 實作混合式與原生整合 - 管理應用程式生命週期與資源 - 新增並設定應用程式環境 |
| 應用程式安全性 | 9% | - 實作驗證與授權 - 保護資料儲存與傳輸 - 設定應用程式真實性 - 設定裝置佈建 |
| 測試與偵錯 | 7% | - 跨裝置與平台進行測試 - 使用記錄與分析功能 - 偵錯用戶端與伺服器端程式碼 |
IBM Worklight V6.0 Mobile Application Development 備考常見疑問一次解答
C2180-278(IBM Worklight V6.0 行動應用程式開發)是 IBM 舉辦的認證考試,通過後可取得 IBM 認證行動應用程式開發人員 - Worklight V6.0 認證,認證等級屬於 中級。本考試與 IBM Certified Mobile System Administrator - Worklight V6.0 (C2180-279) 等認證相關,是規劃 IBM 認證路徑時的重要一環。準備 IBM Worklight V6.0 Mobile Application Development 時,建議搭配 NewDumps 的 54 道練習題,熟悉題型與出題方向。
依官方資訊,C2180-278 考試的題量為 54-60 題,考試時間為 90 分鐘。以這樣的題量與時間來看,平均每題可分配的作答時間相當有限,遇到沒把握的題目建議先標記、跳過,把時間留給有把握的部分,最後再回頭檢查。平時可用 NewDumps 的測試引擎做限時模考,提前適應時間壓力,正式上場才不會慌。
C2180-278 的通過分數為 70%,官方報名費為 USD 200。需要特別留意的是,一旦未通過,重考必須再次全額繳交報名費,時間與金錢成本都不低。建議在正式報名前,先用 NewDumps 的 54 道模擬試題自測,成績穩定達標後再預約考試。
報考 C2180-278 的前置條件為:具備 HTML5、CSS、JavaScript 基礎知識及行動開發概念;建議實際操作過 IBM Worklight V6.0。官方的報考規定可能隨時調整,建議報名前再到官方考試說明頁面確認最新資訊。
以下是官方為 IBM Worklight V6.0 Mobile Application Development 推薦的培訓資源:
完成官方培訓後,再搭配 NewDumps 的 54 道 C2180-278 練習題反覆演練,能把課程所學轉化為實際的答題能力。
可以。NewDumps 提供 C2180-278 免費範例試題(Free PDF Demo),下載後即可檢視實際題型與解析品質,滿意再購買完整版。購買後享有 365 天免費更新,期間內題庫內容隨官方考綱同步修訂;更新期滿後若需續更,可享 50% 折扣優惠。
NewDumps 提供「退款保證」:購買後 60 天內參加 C2180-278 對應考試未通過,可申請全額退款。申請時需於考後 2 天內提交報名證明(准考證)影本與官方成績單(Score Report)PDF,考生姓名須與付款人姓名一致,我們會在 7 天內處理完成;購買後 3 天內應考、未實際參加考試、免費資料與過期訂單不適用。若不想退款,也可選擇免費更換兩個等值考試資料,並保留原購產品的更新服務。交付方面,付款成功後系統會在一分鐘內將產品寄至您的電子郵件信箱,可立即下載使用;若 2 小時內未收到,請聯絡客服協助。產品不限制安裝的電腦數量。
根據官方大綱,C2180-278 考試共分為 6 個領域,主要包括 測試與偵錯(7%)、伺服器端整合與配接器(27%)、部署與管理(9%) 等。各領域的詳細子主題與配分,請參考上方的考試大綱區塊,那裡有最完整的說明。
最新的 IBM Certified Mobile Application Developer C2180-278 免費考試真題:
A mobile application developer has written a hybrid android app and has enabled Push Notifications for it. On subscribing to the eventsource with userId "TestUser", the userID that is persisted in the database is "3266532456798262364265" instead of "TestUser". What is the cause? A security test is missing from the:
- A. adapter methods.
- B. application-descriptor.xml.
- C. adapter methods and the application.
- D. WL.Server.createEventSource function.
A mobile application developer is working on an application and wants to ensure that the application captures client analytic data for later analysis using the IBM WebSphere Analytics Platform (IWAP). What Worklight API call will capture the data and properly forward it to the IWAP to achieve the desired goal?
- A. LogInstance.log()
- B. WL.Analytics.log()
- C. WL.Client.logActivity()
- D. WL.Logger.log()
The following code appears in a Worklight application:
WL.Logger.on({blacklist: ['customer_controller']}); var CustomerMdlLogger = new WL.Logger.create({pkg: ustomer_model);var CustomerMdlLogger = new WL.Logger.create({pkg: ?ustomer_model?); CustomerMdlLogger.info(debug? 1);CustomerMdlLogger.info(debug? 1); WL.Logger.ctx({pkg: ustomer_model).error(debug? 2); WL.Logger.ctx({pkg: ?ustomer_model?).error(debug? 2); WL.Logger.info(ebug 3?;.WL.Logger.info(debug 3?;. CustomerMdlLogger.error(debug? 4); CustomerMdlLogger.error(debug? 4);
What output should a mobile application developer expect?
- A. Option B
- B. Option A
- C. Option D
- D. Option C
The developer chooses to manually add the jQuery Mobile Library instead of using the wizard provided by Worklight Studio. At a minimum, what does the application developer need to do? Copy the jQuery Mobile .js and .css files:
- A. to the project and reference them in the HTML header element.
- B. and the images folder to the project, reference them in the HTML header element and add to the HTML body element <divdata-role="page" id="page"> ... </div>.
- C. and the images folder to the project, and reference them in the HTML header element.
- D. to the project, reference them in the HTML header element and add to the HTML body element <div data-role="page" id="page"> ...</div> and inside <div data-role="content"> ... </div>.
A mobile application developer has finished developing a Hybrid application and is now ready to test it using the IBM Mobile Test Workbench. The developer would like to share the application with a group of testers to maximize test coverage. Which additional service is the developer required to use?
- A. External App Stores
- B. Mobile Browser Simulator
- C. IBM Rational Test Workbench
- D. IBM Application Center
電子當(PDF)試用





1182位客戶反饋


123.136.6.* -
我購買的線上版本的考古題,是最近更新的,我學習它僅花了2天,然后我通過了C2180-278考試,感謝你們!