問題1
What are three considerations when planning an IBM Workload Automation V9.2 installation?
What are three considerations when planning an IBM Workload Automation V9.2 installation?
正確答案: B,E,F
問題2
What should be checked when a previously working workstation does not link after FINAL job stream runs?
What should be checked when a previously working workstation does not link after FINAL job stream runs?
正確答案: D
問題3
When is a local parameter in a job scheduled turn on a fault-tolerant agent (FTA) resolved?
When is a local parameter in a job scheduled turn on a fault-tolerant agent (FTA) resolved?
正確答案: B
問題4
Which two options should be set inorder for a job to be flagged as mission-critical?
Which two options should be set inorder for a job to be flagged as mission-critical?
正確答案: A,D
問題5
Which command cleans up job log files that are over 10 days old on a master domain manager or fault-tolerant agent?
Which command cleans up job log files that are over 10 days old on a master domain manager or fault-tolerant agent?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題6
What is the purpose of the TWSRegistry.dat file?
What is the purpose of the TWSRegistry.dat file?
正確答案: D
問題7
Which two processes are specific to the dynamic agent?
Which two processes are specific to the dynamic agent?
正確答案: A,D