問題1
% = {Uptime (hrs) ÷ [Total Available Time (hrs) - Idle Time (hrs)]} x 100
% = {Uptime (hrs) ÷ [Total Available Time (hrs) - Idle Time (hrs)]} x 100
正確答案: B
問題2
The systems that are vital to continued operations, will significantly impact production or have inherent risks to personnel safety or the environment should they fail. → CRITICAL SYSTEMS
The systems that are vital to continued operations, will significantly impact production or have inherent risks to personnel safety or the environment should they fail. → CRITICAL SYSTEMS
正確答案: B
問題3
Ai = MTBF / (MTBF + MTTR) Where MTBF = Mean Time Between Failures And MTTR = Mean Time to Repair (corrective maintenance only)
Ai = MTBF / (MTBF + MTTR) Where MTBF = Mean Time Between Failures And MTTR = Mean Time to Repair (corrective maintenance only)
正確答案: C
問題4
What is the most common reason for adopting a Total Quality Management system?
What is the most common reason for adopting a Total Quality Management system?
正確答案: D
說明:(僅 NewDumps 成員可見)
問題5
This metric is the ratio of the number of systems in a facility for which a criticality analysis has been performed divided by the total number of systems in the facility, expressed as a percentage. → Systems Covered by Criticality Analysis
This metric is the ratio of the number of systems in a facility for which a criticality analysis has been performed divided by the total number of systems in the facility, expressed as a percentage. → Systems Covered by Criticality Analysis
正確答案: B
問題6
Ao = MTBM / (MTBM + MDT) Where MTBM = Mean Time Between Maintenance And MDT = Mean Down Time
Ao = MTBM / (MTBM + MDT) Where MTBM = Mean Time Between Maintenance And MDT = Mean Down Time
正確答案: C
問題7
A set of interrelated or interacting elements. In the context of dependability, a system will have the following: a defined purpose expressed in terms of required functions, stated conditions of operation and defined boundaries.
A set of interrelated or interacting elements. In the context of dependability, a system will have the following: a defined purpose expressed in terms of required functions, stated conditions of operation and defined boundaries.
正確答案: B
問題8
corrective work done on previously maintained equipment that has prematurely failed due to maintenance, operations or material problems
corrective work done on previously maintained equipment that has prematurely failed due to maintenance, operations or material problems
正確答案: D
問題9
During design → PM schedule compliance should be equal or greater than 95%.
(T/F)
During design → PM schedule compliance should be equal or greater than 95%.
(T/F)
正確答案: A
問題10
% = [Condition Based Maintenance Cost ($) ÷ Total Maintenance Cost ($)] × 100
% = [Condition Based Maintenance Cost ($) ÷ Total Maintenance Cost ($)] × 100
正確答案: B
問題11
How is beginning inventory calculated in a periodic inventory system using the weighted-average cost flow method?
How is beginning inventory calculated in a periodic inventory system using the weighted-average cost flow method?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題12
(%) = (Corrective Maintenance Cost ×100) ÷ Total Maintenance Cost
(%) = (Corrective Maintenance Cost ×100) ÷ Total Maintenance Cost
正確答案: D