問題1
You need to run a benchmark test to verify the performance of a new multi-user database storage implementation before loading the real data.
What are three features you will need in the benchmark/workload generator to accomplish this task? (Choose three.)
You need to run a benchmark test to verify the performance of a new multi-user database storage implementation before loading the real data.
What are three features you will need in the benchmark/workload generator to accomplish this task? (Choose three.)
正確答案: B,C,E
問題2
A mission critical SQL server application that resides in a three-tier HDT pool is showing response time spikes that may be related to I/O activity.
Which three Hitachi Tuning Manager reports would you use to determine the problem? (Choose three.)
A mission critical SQL server application that resides in a three-tier HDT pool is showing response time spikes that may be related to I/O activity.
Which three Hitachi Tuning Manager reports would you use to determine the problem? (Choose three.)
正確答案: A,B,C
問題3
You are sizing a storage system for a response-sensitive database application in a VMware environment.
Which two statements are true in this scenario? (Choose two.)
You are sizing a storage system for a response-sensitive database application in a VMware environment.
Which two statements are true in this scenario? (Choose two.)
正確答案: A,D
問題4
A high level of writes to external storage is backing up into a VSP G1000 cache, creating a high write pending problem that is affecting other workloads.
Which three actions will help to minimize this problem? (Choose three.)
A high level of writes to external storage is backing up into a VSP G1000 cache, creating a high write pending problem that is affecting other workloads.
Which three actions will help to minimize this problem? (Choose three.)
正確答案: A,C,E
問題5
Which three statements are true regarding the Hitachi external storage architecture? (Choose three.)
Which three statements are true regarding the Hitachi external storage architecture? (Choose three.)
正確答案: A,B,E
問題6
On a VSP G1000, the maximum I/O Request Limit for an external initiator port has been exceeded. What are two consequences of this activity? (Choose two.)
On a VSP G1000, the maximum I/O Request Limit for an external initiator port has been exceeded. What are two consequences of this activity? (Choose two.)
正確答案: A,C