問題1
Which of the following written materials must be provided to a new home occupant to comply with Energy and Atmosphere Prerequisite, Education of the Homeowner, Tenant or Building Manager?
Which of the following written materials must be provided to a new home occupant to comply with Energy and Atmosphere Prerequisite, Education of the Homeowner, Tenant or Building Manager?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題2
A project team wants to earn credit for Location and Transportation Credit, Site Selection, Option 3: Open Space. A qualifying lot should be located within:
A project team wants to earn credit for Location and Transportation Credit, Site Selection, Option 3: Open Space. A qualifying lot should be located within:
正確答案: C
說明:(僅 NewDumps 成員可見)
問題3
Sustainable Sites Prerequisite, No Invasive Plants requires that all site vegetation:
Sustainable Sites Prerequisite, No Invasive Plants requires that all site vegetation:
正確答案: A
說明:(僅 NewDumps 成員可見)
問題4
How is credit earned under Regional Priority Credit, Regional Priority when the credit has multiple thresholds?
How is credit earned under Regional Priority Credit, Regional Priority when the credit has multiple thresholds?
正確答案: D
說明:(僅 NewDumps 成員可見)
問題5
In order for a project to earn Innovation Credit, LEED AP for Homes, the LEED AP for Homes must be a principal member of the:
In order for a project to earn Innovation Credit, LEED AP for Homes, the LEED AP for Homes must be a principal member of the:
正確答案: A
說明:(僅 NewDumps 成員可見)
問題6
What is a benefit of rainwater harvesting in areas with substantial rainfall spikes?
What is a benefit of rainwater harvesting in areas with substantial rainfall spikes?
正確答案: C
說明:(僅 NewDumps 成員可見)
問題7
Which important factors must be considered when calculating the design landscape water requirements?
Which important factors must be considered when calculating the design landscape water requirements?
正確答案: A
說明:(僅 NewDumps 成員可見)
問題8
A developer is planning to build 40 single-family homes on a two-acre (0.8 hectare) site. Under the Location and Transportation Credit, Compact Development, what is the maximum number of points that the developer can achieve?
A developer is planning to build 40 single-family homes on a two-acre (0.8 hectare) site. Under the Location and Transportation Credit, Compact Development, what is the maximum number of points that the developer can achieve?
正確答案: D
說明:(僅 NewDumps 成員可見)
問題9
Points can be earned for Energy and Atmosphere Credit: Efficient Hot Water Distribution System, Option 1 through which of the following measures?
Points can be earned for Energy and Atmosphere Credit: Efficient Hot Water Distribution System, Option 1 through which of the following measures?
正確答案: D
說明:(僅 NewDumps 成員可見)
問題10
Which of the following products will be eligible for points toward Materials and Resources Credit, Environmentally Preferable Products, Option 1: Local Production?
Which of the following products will be eligible for points toward Materials and Resources Credit, Environmentally Preferable Products, Option 1: Local Production?
正確答案: D
說明:(僅 NewDumps 成員可見)