問題1
Most electric service providers require interactive PV equipment to comply with which for interconnection to their distribution grid?

正確答案: B
問題2
A PV system equipped with rapid shutdown requires a label stating ''RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM''.
Which is the BEST description of where this label is required?

正確答案: D
問題3
A 5 kW PV system has a derate factor of 0.82. The site receives 5.5 PSH daily. What is the expected daily AC energy output?

正確答案: C
問題4
Thermal imaging infrared cameras can be used to help find which of the following system operational issues?

正確答案: A
問題5
A system's performance ratio (PR) is calculated as 0.85. If the array capacity is 10 kW and PSH is 5, what is the daily AC output?

正確答案: D
問題6
A rooftop PV system is proposed for a commercial building with a membrane roof. The structural engineer specifies a maximum allowable dead load of 5 psf. The PV modules weigh 3 psf, and the racking adds 1.5 psf.
What additional load can be added without exceeding the limit?

正確答案: A
問題7
A bifacial array gains 15% additional power from rear-side irradiance. If the front-side output is 10 kW, what is the total output?

正確答案: D
問題8
Which of the following should a PV installer do during dc insulation resistance testing?

正確答案: C
問題9
A PV module has a temperature coefficient of power of -0.4%/°C and a rated power of 300W at STC (25°C).
What is the expected power output if the module temperature rises to 55°C?

正確答案: C
問題10
A 1. 100 ft, 2 ranch home with cathedral callings has a 14 ft. x 41 ft. 8 in , south-facing , composite shingle roof. An engineer has determined that the home's 2 in, x 6 in. on-center roof rafters are strong enough to gold a solar electric system. The system will have 62.25 in. x 32.50 in. modules with a 1-in gap between modules and a standard twin-rill mounting system number of modules that can fit on the roof on under these conditions?

正確答案: C
問題11
A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that:

正確答案: D
問題12
A ground resistance measurement on a newly installed grounding electrode indicates a resistance of 130#. The earth connection may be improved by connecting the existing electrode to a:

正確答案: D
問題13
A technician has been called to a scale due to a low-performing array. The technician will perform tests in the
24-source circuit combiner box. After putting on the correct PPE and turning off and performing lock.tagout of the inverted and combiner disconnect. Which is the next step to safely begin electrical testing in the combiner box?

正確答案: B

專業認證

NewDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用NewDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

Try Before Buy

NewDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。