問題1
An architect is developing a master plan for a small area of a city located on a lake. The master plan has four open sites being considered for a proposed park. The city needs to avoid incoming noise pollution at the park and provide a variety of activities for the city.
Click on the open site that is appropriate for a city park with baseball fields and nature trails.
正確答案:

Explanation:
open site directly adjacent to the industrial zone
It is away from the airport noise to the west.
It is separated from the residential low-rise and waterfront areas, reducing impact on sensitive neighbors.
It provides enough space and separation from commercial and retail zones (right map).
It avoids the smaller open sites on the waterfront and retail area, which are constrained and may be affected by residential noise concerns or limited in size.
問題2
During design development of a new college laboratory facility, the owner asks the architect to include way- finding signage mounted adjacent to doors. The type of signage requested will project into the corridors of the building.
Which of the following should the architect consider when selecting the signage? Check the three that apply.

正確答案: B,D,E
說明:(僅 NewDumps 成員可見)
問題3
A 100,000-square-foot distribution warehouse has roof drains around the perimeter.
Which combination of structure and roofing system insulation is most cost effective?

正確答案: A
說明:(僅 NewDumps 成員可見)
問題4
Which of the following strategies is most appropriate for a new shopping center to be constructed on a nearly flat site flowing into a municipal subsurface storm-drainage system that is at capacity during a 5-year storm?

正確答案: B
說明:(僅 NewDumps 成員可見)
問題5
An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school's increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
*The relocated front entrance must be easily recognizable, highly visible, and secure.
*Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.
*Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.
Building information:
*Construction Type is II-B.
The following resources are available for your reference:
*Existing Plans, including site and floor plans
*Proposed Plans, including site and floor plans
*Cost Analysis
*Zoning Ordinance Excerpts, for off-street parking requirements
*IBC Excerpts, showing relevant code sections
*ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design The project team decides to cover the roof area above the gymnasium and platform with 350 watt, stationary, photovoltaic (PV) panels. Each panel requires 20 square feet, accounting for access aisles and safety clearances. The PV system will be tied to the local power company's electrical grid, and will not have battery storage. The school is located in a region that gets an average of 4 usable hours of sunlight per day.
Which of the following PV system design considerations apply to this project? Check the three that apply.
Refer to the project involving an elementary school renovation and addition with photovoltaic (PV) panels on the gymnasium roof (350-watt panels, 20 sq ft each, ~4 usable sunlight hours/day). The PV system is grid-tied without battery storage.
Which of the following PV system design considerations apply? Check the three that apply.

正確答案: B,C,D
說明:(僅 NewDumps 成員可見)
問題6
Which of the following is the most effective way to reduce noise in mechanical air delivery systems?

正確答案: B
說明:(僅 NewDumps 成員可見)
問題7
When designing a three-story wood-frame home located in a high wind region, the addition of a green roof with a two-foot soil bed would do which one of the following?

正確答案: C
說明:(僅 NewDumps 成員可見)
問題8
A divisional cost breakdown method of cost estimating has which of the following advantages over a cost per square foot method of cost estimating?

正確答案: D
說明:(僅 NewDumps 成員可見)
問題9
An architect is selecting a mechanical system for the first floor of a hotel in a temperate climate. They must consider the following:
* The building footprint covers 95% of the small urban site.
* The first floor has an open floor plan that includes a lobby, bar, and restaurant.
* The plan can only accommodate one 500 sf mechanical room.
What mechanical system should the architect recommend?

正確答案: B
說明:(僅 NewDumps 成員可見)

專業認證

NewDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用NewDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

Try Before Buy

NewDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。