問題1
When designing a redundant IP storage network for data movement or access of remote data, which two must be considered? (Choose two)
When designing a redundant IP storage network for data movement or access of remote data, which two must be considered? (Choose two)
正確答案: C,D
問題2
You are preparing a detailed design, applying ILM principles. Which two processes are performed during the detailed design phase? (Choose two)
You are preparing a detailed design, applying ILM principles. Which two processes are performed during the detailed design phase? (Choose two)
正確答案: B,C
問題3
What is the primary objective of the storage capacity planning process?
What is the primary objective of the storage capacity planning process?
正確答案: A
問題4
Company.com needs to protect against data corruption. You must assume that it could take the company up to three hours to determine that their data is corrupted. They want to have a snapshot every hour. The production data is not write intensive. If a split mirror snapshot is used, incremental establishment takes 15 minutes. Which solution fulfils their needs and is the most cost effective?
Company.com needs to protect against data corruption. You must assume that it could take the company up to three hours to determine that their data is corrupted. They want to have a snapshot every hour. The production data is not write intensive. If a split mirror snapshot is used, incremental establishment takes 15 minutes. Which solution fulfils their needs and is the most cost effective?
正確答案: C
問題5
A disaster recovery (DR) Plan includes synchronously replicating data between a production and Remote site and implementing a to-member extended distance cluster. Company.com uses a database application that can run in parallel mode. What should Company.com do?
A disaster recovery (DR) Plan includes synchronously replicating data between a production and Remote site and implementing a to-member extended distance cluster. Company.com uses a database application that can run in parallel mode. What should Company.com do?
正確答案: B
問題6
You are tasked with connecting a new pair of hosts to an existing SAN infrastructure. The existing infrastructure is a 2Gb/s Fibre Channel solution on the far side of your facility. What are three concerns for the new infrastructure? (Choose three.)
You are tasked with connecting a new pair of hosts to an existing SAN infrastructure. The existing infrastructure is a 2Gb/s Fibre Channel solution on the far side of your facility. What are three concerns for the new infrastructure? (Choose three.)
正確答案: A,C,D
問題7
What is the goal of a SAN designed with no single point of failure?
What is the goal of a SAN designed with no single point of failure?
正確答案: A
問題8
What is not affected by distance?
What is not affected by distance?
正確答案: A
問題9
Your client is applying ILM principles as they develop a storage strategy. Which two processes are performed in the strategy phase? (Choose two.)
Your client is applying ILM principles as they develop a storage strategy. Which two processes are performed in the strategy phase? (Choose two.)
正確答案: A,D