問題1
What is the primary function of the Cluster Aware AIX (CAA) in a PowerHA environment?
What is the primary function of the Cluster Aware AIX (CAA) in a PowerHA environment?
正確答案: C
問題2
To prevent downtime, which redundancy should be planned for in an IBM PowerHA SystemMirror environment? (Choose two)
To prevent downtime, which redundancy should be planned for in an IBM PowerHA SystemMirror environment? (Choose two)
正確答案: B,C
問題3
What is the purpose of configuring recovery and notify commands in PowerHA?
What is the purpose of configuring recovery and notify commands in PowerHA?
正確答案: C
問題4
Which steps are crucial in the deployment phase to ensure solution stability and reliability? (Choose Two)
Which steps are crucial in the deployment phase to ensure solution stability and reliability? (Choose Two)
正確答案: B,C
問題5
What is an essential factor to plan for application availability in a PowerHA environment?
What is an essential factor to plan for application availability in a PowerHA environment?
正確答案: A
問題6
What is a key architectural requirement for eliminating single points of failure in a PowerHA SystemMirror for AIX environment?
What is a key architectural requirement for eliminating single points of failure in a PowerHA SystemMirror for AIX environment?
正確答案: C