BCS TAE題庫介紹
光靠死背很難應付 BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer 的實戰題型,臨場手感需要反覆演練。NewDumps 的測試引擎完整模擬 TAE 正式考試環境,42 道模擬試題練熟之後,上場自然從容。
BCS TAE 考試概覽:
| 認證廠商: | BCS / ISTQB |
|---|---|
| 考試名稱: | ISTQB Certified Tester Advanced Level - 測試自動化工程師 (TAE) |
| 考試代碼: | CTAL-TAE |
| 支援語言: | English |
| 相關認證: | ISTQB Certified Tester Foundation Level ISTQB Advanced Level Test Analyst ISTQB Advanced Level Technical Test Analyst |
| 考試形式: | 情境式試題, 選擇題(典型的 ISTQB Advanced Level 題型) |
| 證照有效期限: | 終身有效(ISTQB 證照不會過期) |
| 推薦課程: | BCS 培訓資源 ISTQB 官方教學大綱與教材 |
| 考試報名: | ISTQB 官方網站 BCS 官方認證頁面 |
| 範例考題: | BCS TAE 範例考題 |
| 考試方式: | 透過具認證資格的 ISTQB 成員委員會進行電腦化考試(例如英國的 BCS),通常採線上監考或測驗中心方式。 |
| 必備條件: | 建議/要求在參加 Advanced Level Test Automation Engineer 考試前,先取得 ISTQB Foundation Level 證照。 |
| 官方大綱網址: | https://www.istqb.org |
BCS TAE 考試大綱主題:
| 章節 | 目標 |
|---|---|
| 測試自動化導論 | - 測試自動化的成功因素 - 測試自動化的目的與效益 |
| 測試自動化中的風險與指標 | - 評估自動化成效的指標 - 以風險為基礎的測試自動化策略 |
| 部署與維護 | - 測試執行與報告 - 自動化測試資產的維護 - 處理不穩定測試與穩定性問題 |
| 測試自動化實作 | - 與 CI/CD 管線整合 - 自動化測試設計 - 腳本撰寫與實作方法 |
| 測試自動化架構 | - 測試自動化框架 - SUT (System Under Test) 考量 - 自動化架構設計原則 |
BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer 備考常見疑問一次解答
TAE(ISTQB Certified Tester Advanced Level - 測試自動化工程師 (TAE))是 BCS / ISTQB 舉辦的認證考試,通過後可取得 ISTQB Certified Tester Advanced Level - 測試自動化工程師 認證,認證等級屬於 進階級。本考試與 ISTQB Certified Tester Foundation Level、ISTQB Advanced Level Test Analyst、ISTQB Advanced Level Technical Test Analyst 等認證相關,是規劃 BCS / ISTQB 認證路徑時的重要一環。準備 BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer 時,建議搭配 NewDumps 的 42 道練習題,熟悉題型與出題方向。
報考 TAE 的前置條件為:建議/要求在參加 Advanced Level Test Automation Engineer 考試前,先取得 ISTQB Foundation Level 證照。。官方的報考規定可能隨時調整,建議報名前再到官方考試說明頁面確認最新資訊。
TAE 可透過以下官方管道報名:
本考試的考試方式為:透過具認證資格的 ISTQB 成員委員會進行電腦化考試(例如英國的 BCS),通常採線上監考或測驗中心方式。。
以下是官方為 BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer 推薦的培訓資源:
完成官方培訓後,再搭配 NewDumps 的 42 道 TAE 練習題反覆演練,能把課程所學轉化為實際的答題能力。
可以。NewDumps 提供 TAE 免費範例試題(Free PDF Demo),下載後即可檢視實際題型與解析品質,滿意再購買完整版。購買後享有 365 天免費更新,期間內題庫內容隨官方考綱同步修訂;更新期滿後若需續更,可享 50% 折扣優惠。
NewDumps 提供「退款保證」:購買後 60 天內參加 TAE 對應考試未通過,可申請全額退款。申請時需於考後 2 天內提交報名證明(准考證)影本與官方成績單(Score Report)PDF,考生姓名須與付款人姓名一致,我們會在 7 天內處理完成;購買後 3 天內應考、未實際參加考試、免費資料與過期訂單不適用。若不想退款,也可選擇免費更換兩個等值考試資料,並保留原購產品的更新服務。交付方面,付款成功後系統會在一分鐘內將產品寄至您的電子郵件信箱,可立即下載使用;若 2 小時內未收到,請聯絡客服協助。產品不限制安裝的電腦數量。
根據官方大綱,TAE 考試共分為 5 個領域,主要包括 測試自動化架構、部署與維護、測試自動化中的風險與指標 等。各領域的詳細子主題與配分,請參考上方的考試大綱區塊,那裡有最完整的說明。
最新的 BCS Certification TAE 免費考試真題:
問題 #1
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?
A. Complexity to automate
B. Maturity of the test process
C. Frequency of use
D. Sustainability of the automated environment
問題 #2
You areusing a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?
A. The Test Adaption layer
B. The Test Execution layer
C. The test Generation layer
D. The Test Definition layer
問題 #3
A regression test suite consist of 500 test cases which are allexecuted manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lastedone month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?
A. The target defined for the business case is too accurate -it should not be measureable
B. The project selected for the pilot is too critical -if should not be too critical or too trivial
C. The target defined for the business case seems difficult to hit - it should be realistic
D. Theduration of the pilot project was too short -it should last unit the success factors are achieved
問題 #4
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?
A. Complexity to automate
B. Maturity of the test process
C. Frequency of use
D. Sustainability of the automated environment
問題 #5
You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?
A. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
B. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
C. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.
D. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
問題與答案:
| 問題 #1 答案: D | 問題 #2 答案: A | 問題 #3 答案: C | 問題 #4 答案: D | 問題 #5 答案: B |
電子當(PDF)試用





786位客戶反饋


5.20.194.* -
我的父母正為我感到驕傲,因為我第一次成功的通過了 TAE 考試。你們的題庫是真的有用的。